New Precast Bridge Girder with Combined Prestressing Cover Image

New Precast Bridge Girder with Combined Prestressing
New Precast Bridge Girder with Combined Prestressing

Author(s): Martin Moravčík, Petra Bujnakova
Subject(s): Transport / Logistics
Published by: Žilinská univerzita v Žilině
Keywords: highway bridges; Slovakia; Precast Bridge Girder;

Summary/Abstract: Traditionally, the major part of highway bridges in Slovakia is realized using the precast concrete technology. The common Slovak precast girders are produced to the34 m length as one element. Nowadays, there is an increasing demand for more economical and resisting bridge structures with longer spans. The company Vahostav-Sk-PREFA, Ltd as the main supplier of precast elements for highwaybridge 207, in cooperation with theUniversity of Zilina and the designer company Dopravoprojekt Inc. Liptovsky Mikulas, developed a new precast girder MDP for the span 38 m with combined prestressing. Some experiences and results of verifying flexural test with numerical analysis of that girder are presented in this paper.

  • Issue Year: 13/2011
  • Issue No: 3
  • Page Range: 19-23
  • Page Count: 5
  • Language: English
Toggle Accessibility Mode