CALCULATING VALUE AT RISK. CASE STUDY ON THE INTEREST RATE RISK MANAGEMENT Cover Image

CALCULATING VALUE AT RISK. CASE STUDY ON THE INTEREST RATE RISK MANAGEMENT
CALCULATING VALUE AT RISK. CASE STUDY ON THE INTEREST RATE RISK MANAGEMENT

Author(s): Simona Mutu, Eugenia Ana Matiş
Subject(s): Economy
Published by: Studia Universitatis Babes-Bolyai
Keywords: value at risk; time varying volatility; Historical Simulation; Monte Carlo Simulation; interest rate Risk;

Summary/Abstract: Value at risk assesses financial risk by evaluating the probability of loss that results from stochastic variation of the rate of returns. The methodology is based on historical data reflecting this variation, usually as an estimated probability of default function. The fact that return distributions are characterized by time varying volatility poses exceptional challenges in the estimation. In order to remedy this problem we can use Monte Carlo Simulations. This paper is meant to offer an overview of the main Value-at-Risk models and methods used for the Management of interest rate risk, with an emphasis on the Monte Carlo Simulation method.

  • Issue Year: 54/2009
  • Issue No: 2
  • Page Range: 90-99
  • Page Count: 10
  • Language: English
Toggle Accessibility Mode