Wybór momentu rozpoczęcia projektu z wykorzystaniem interaktywnego podejścia wielokryterialnego
Scheduling of project start time using interactive multicriteria approach
Author(s): Krzysztof Targiel, Maciej Nowak, Tadeusz TrzaskalikSubject(s): Economy
Published by: Wydawnictwo Uniwersytetu w Białymstoku
Keywords: zarządzanie projektem; wielokryterialne metody interaktywne; modelowanie ryzyka; project management; interactive multi-criteria approach; binomial trees; risk modelling
Summary/Abstract: Selection of project start time is a problem that decision makers often face. This is important when, e.g., the final results depend on currency exchange rates. Sometimes more favourable rates can be expected in the future, but postponing the project start date involves the risk of delay beyond acceptable limits. In the paper, the Cox-Ross-Rubinstein method (CRR), based on binominal trees, is applied. Two criteria are taken into account: project cost and the probability of project delay. It is assumed that the parameters of probability distribution are specified by experts. The problem is presented as a dynamic process. An interactive technique of multi-criteria decision-making about problems under risk is proposed. The procedure uses trade-offs to select a proposal, which is next evaluated by the decision maker.
Journal: Optimum. Economic Studies
- Issue Year: 87/2017
- Issue No: 3
- Page Range: 19-30
- Page Count: 12
- Language: Polish