DETERMINATION OF CRITICAL PATTERN OF 60 METER SHIP CONSTRUCTION PROJECT USING PRECEDENCE DIAGRAM METHOD (PDM) Cover Image

DETERMINATION OF CRITICAL PATTERN OF 60 METER SHIP CONSTRUCTION PROJECT USING PRECEDENCE DIAGRAM METHOD (PDM)
DETERMINATION OF CRITICAL PATTERN OF 60 METER SHIP CONSTRUCTION PROJECT USING PRECEDENCE DIAGRAM METHOD (PDM)

Author(s): I Nengah Putra Apriyanto, Suyono Thamrin, Edi Suhardono, Beny Rudiawan, Arica Dwi Susanto
Subject(s): Education, General Reference Works, Business Economy / Management
Published by: Regional Department of Defense Resources Management Studies
Keywords: Controlling; Planning; Critical trajectories; PDM;

Summary/Abstract: PT. XYZ in Surabaya is engaged in the production of commercial ships, providing ship repair and maintenance services as well as general engineering with specifications based on orders. Along with the development of the technology industry, ship production requires every shipyard to evaluate the system used. The time delay is the problem of building a 60-meter commercial ship. The PrecedenceDiagram Method (PDM) is a method for scheduling project time and showing critical trajectories of project activities. The results showed that in the project scheduling,there are 13 activities that have a zero value or critical activity which are activities1, 2, 3, 4, 5, 7, 9, 15, 16, 20, 22, 23, 26, 27, 28 So that it needs more strict control and supervision from the contractor in carrying out the activities of the 60 meter commercial shipbuilding project activities for each activity/activity so that it does not experience delays and the project can be completed on time.

  • Issue Year: 10/2019
  • Issue No: 2
  • Page Range: 127-144
  • Page Count: 18
  • Language: English