Оптимизация на планирането на работното време при изпълнение на малки строителни услуги
Optimization of the Scheduling of Short-Time Construction Activities
Author(s): Deyan Mihaylov
Subject(s): Business Economy / Management, Human Resources in Economy
Published by: Икономически университет - Варна
Keywords: Construction Activities; Cutting Stock Problem; Efficient Schedule
Summary/Abstract: This report examines the possibility to optimize the scheduling of shorttime construction activities. For the purposes of the study, a “short” construction activity shall mean one whose execution time is shorter than the normal working day. Generally, different activities have different durations. It’s proposed to use the linear optimization model of one-dimensional cuttings when creating such schedules. The minimum number of working days needed for the execution of a large number of activities is accepted as a criterion of optimality. The proposed method allows to create more efficient schedules.
- Page Range: 193-200
- Page Count: 8
- Publication Year: 2018
- Language: Bulgarian
- Content File-PDF