PRVA FAZA U REALIZACIJI PROJEKTA SANACIJE, KONZERVACIJE I INTEGRALNE REKONSTRUKCIJE CRKVE SVETOG GEORGIJA U GOMILJANIMA
STAGE I OF THE PROJECT FOR THE REPAIR, CONSERVATION AND RECONSTRUCTION OF ST GEORG'S CHURCH
Author(s): Emir SoftićSubject(s): Cultural history
Published by: Komisija za očuvanje nacionalnih spomenika
Keywords: Investigative works; geodetic survey; geological and geomechanical soil tests; microscopic analysis of stone; archaeological investigations; church; Gomiljani.
Summary/Abstract: Investigative works were carried out at the site of St George’s church in Gomiljani with a view to obtaining the information and initial parameters needed for later stages of the project for the repair, conservation and reconstruction of the church. The cumulative cost of these works was 30,808.20 KM, financed from the budget of the Federation of Bosnia and Herzegovina as part of the Intervention measures to protect national monuments funded from the state budget. The works carried out, in association with and with the agreement of the Zahum Herzegovina and Primorje Eparchy and the Institute for the Protection of the Cultural, Historical and Natural Heritage of Republika Srpska, were a) a geodetic survey of the site in horizontal and vertical control, a survey of the remains of the church walls, cruciform tombstones and other graves and of the stone wall around the churchyard, and drawing a site plan; b) geological and geomechanical tests of the soil characteristics, and a macroscopic and microscopic analysis of the building stone, mortar and plaster; c) systematic archaeological investigations of the church and its immediate surroundings.
Journal: Baština
- Issue Year: 2008
- Issue No: IV
- Page Range: 365-390
- Page Count: 13
- Language: English
- Content File-PDF